Резюме от 16 сентября 2018 PRO

Babyak Vasily Petrovich

Technical Director, Chief engineer, head specialist of biogas complex

Полная занятость.

Возраст:
38 лет
Город:
Киев

Контактная информация

Соискатель указал телефон, адрес и эл. почту.

Чтобы открыть контакты, войдите как работодатель или зарегистрируйтесь.


Опыт работы

Head of the department of heat and gas supply

с 04.2014 по 09.2018 (4 года 5 месяцев)
ZORG Biogas, Киев (Design and build of biogas complexes)

During the period of my labor activity at the company "Zorg biogas of Ukraine" the following work was carried out:
- Management and verification of the correctness of the decisions taken by the special-ists of the department of heat and gas supply. Definition and distribution of priority tasks in the process. Controlling the execution of works at all stages
- Carrying out research in the software packages (Ansys, Comsol mul-tiphisics) on the analysis of the operation of the systems of heat and gas supply of biogas complex with further improvement of design decisions.
- Development of calculation programs (for gas supply, heating of enzymes, heat sup-ply) in the software package Mathcad to reduce the time for calculations of heating sys-tems for tanks, gas supply and heat supply and making optimal decisions regarding the choice of main equipment and diameters of pipelines depending on different modes of operation biogas complex.
- Design of heat supply systems, gas supply, heating, air-conditioning of the biogas complex with cogeneration units "Embacher" (performed sections of the project: gas supply, heat supply of fermenters, heat supply station, heating networks, heating and ventilation, technological solutions).
For the entire period of work he participated in the design of heat supply systems, gas supply in about 30 projects of biogas complexes with electric capacity - from 1 to 12 MW. The total capacity of the projected facilities was 52 MW, of which 37 MW are used or built.

Head of department

с 01.2011 по 03.2014 (3 года 2 месяца)
Energotehservice, Kiev (Heat power engineering)

The work on the design of boilers and heat - point average power (thermal power 1 - 3 MW). In addition, the lead supervision over the execution of works for the construc-tion of boiler house thermal power of 30 MW for the needs for heating and water sup-plies state enterprise airport "Borispol"


Образование

Kiev polytechnical institute NTUU "KPI"

" Thermal and Nuclear Power Plants " department and qualified specialist in energy engineering , Kiev
Высшее, с 09.1997 по 02.2003 (5 лет 5 месяцев)


Профессиональные и другие навыки

Навыки работы с компьютером
Fluency in engineering software products : Autocad, Mathcad, Word, Excel, Project, AVK, AC 4ПИР


Дополнительная информация

Summary
1. Babyak Vasily
2. Home address: Ukraine,
Kiev region.Bucha, st. Field 24, flat №45 .
ZIP code: 08292 .
3. Nationality: Ukrainian
4. Home phone: [открыть контакты](см. выше в блоке «контактная информация»)
5. Сell phone: [открыть контакты](см. выше в блоке «контактная информация»)
5. E-mail : [открыть контакты](см. выше в блоке «контактная информация»)
6. Date of Birth: February 21, 1980 .
7. Education:
In 2003, I graduated from the National Technical University of Ukraine " Kiev Polytechnic Institute" and received a full college education with a degree in " Thermal and Nuclear Power Plants " and qualified specialist in energy engineering .
Them of the work: Darnytska electric power station №4 in Kiev. Modernization boiler and turbine equipment. Reconstruction of boiler burner TP -13 ( 75 tons / hour) with order to increase efficiency burning low-grade coal.
From 2003 to 2006 I studied at the graduate school at the Academy of Sciences of Ukraine at the Institute of Engineering Thermophysics ( NASU ITTF ).

8. Professional experience:
From 2011 and on time for today I have been working in the design and installation company PP "NT Energotehservis " as the head of the department of heating , at the same time serving as a Senior engineer.
Work in Progress : The work on the design of boilers and heat - point average power (thermal power 1 - 3 MW). In addition, the lead supervision over the execution of works for the construction of boiler house thermal power of 30 MW for the needs for heating and water supplies state enterprise airport "Borispol"

With 08.2009 to 12.2011 . worked in the design organization "SPECTRUM" of "Mironovsky hleboprodukt " as a chief specialist in designing boilers , heating pipes and other. In addition, the work was carried out by energy audits in enterprises "Mironovsky hleboprodukt " in order to reduce energy consumption.
Work in Progress : the development of projects of medium and large boilers and heat points ( steam and water ). Designing pipes of steam and hot water.

With 06.2008 to 07.2009. worked in the company " Kolvi " as an engineer - designer boiler house average power ( up to 10.1 MW) and high power ( greater than 10 MW) and heat points .

Work in Progress : the development of projects of medium and large boilers and heat points ( steam and water ). Designing pipes of steam and hot water.

9. Knowledge of languages: Russian , Ukrainian - fluent , English – upper advanced.

10. Additional information:
- engage in the collection and analysis of data , technical information on the operation of biogas plants for medium and large agricultural land. Plans for the future in more de-tail in the design and development of biogas plants as well as improving their performance;
- fluency in engineering software products : AutoCAD, Compass , RauWin / RauCad, Office, MathCad;
- solution of engineering problems using the MF application programming : Pascal, Visual Basic for AutoCAD and Excel.
- have three publications (all scientific and technical )
- communication skills, sociability , ability to find creative approach to solving complex engineering problems.

11. Professional achievements and skills:
1) Design and supervision of construction works for installation of steam- water boiler house (capacity 0,5-30 MW) and steam -water grids .

2) Design of the district heating system for biogas complex sugar mill in the village Rokitno Kyiv region with electric power of 2.2 MW (ZORG BioGAS Co - September 2013) . Were carried out work on the design of heat supply , external heating networks and heating systems substances in fermenters .

3 ) Conduct energy audits on powerful thermal power plants of the corporation " Kazakhmys " in the Republic of Kazakhstan. Namely, Balhashska CHP Zhezkazgan CHP power plant in Karaganda, thermal station number 1 and number 2 in Satpaeva(2012). As a result of the above test facilities were developed basic technical and eco-nomic measures to improve the energy performance of major equipment and facility as a whole.

4) When designing a new facility or renovation, I carried out calculations of heat loads on the platform to develop the concept of energy facility design. A well developed fea-sibility studies for the implementation of new systems and technologies.

5) Developed and implemented into practice schemes for rational use of heat on a number of leading companies glass products of Ukraine and Russia, such as:
- "Bucha factory glass" (Ukraine)-heat utilization plants 1,7 MW(2005);
- "Glassworks Rokytnivskyi" (Ukraine)-heat utilization plants 1,4 MW(2006);
- "Piskivskyy Glassware Factory" (Ukraine)-heat utilization plants 1,5 MW(2007);
- "Aktis " (Russia, Novocherkassk)-heat utilization plants 1,1 MW(2008), and others.

6) Was developed and partially implemented the project on insulation of buildings in the City Irpen .
7) Developed measures to improve energy efficiency in the company of " Mironovsky Hleboprodukt ", which specializes in growing and processing of chicken.


Сохранить в отклики Уже в откликах

Похожие резюме

Все похожие резюме


Сравните свои требования и зарплату с вакансиями других компаний: