Resume from December 8, 2021 File

Yalcin

Inşaat müdürü

Age:
44 years
City:
Kyiv

Contact information

The job seeker has entered a phone number and email.

Name, contacts and photo are only available to registered employers. To access the candidates' personal information, log in as an employer or sign up.

Uploaded file

Quick view version

This resume is posted as a file. The quick view option may be worse than the original resume.

CAVİT YALÇIN RAMADANOĞLU

Kadıköy
İSTANBUL/TURKEY
GSM : [open contact info](look above in the "contact info" section)
E-MAİL: [open contact info](look above in the "contact info" section)

I graduated from Mersin University Construction. I have been actively working on my
profession for 16 years. I have a lot of experience and I am still open to improvement. I know
Microsoft office, autocad programs. I know English (intermediate level), Russian (beginner
level). I have no travel restrictions and I would like to work abroad.With my experience, I want to
improve myself by working in a long-established and large company.
Career Experience Construction manager KAZAKİSTAN
I work as a construction chief in Subcontractor Nur sultan medical university building we made
formwork steel Concrete slab formwork system
job 3 block 23000 m2 foundation

Artist Dekorasyon construction manager

I work as a construction site chief, I work at our company that does apartment, sh renovation and
desing works, gypsum paint, plasterboard screed, parquet, ceram installation, electrical works,
kitchen cabinet, bathroom cabinets, turnkey construction wor we do interior disign works

FEBRUARY 2018- KARDEŞ MÜH.
SİTE CHİEF
-Denizli Ornaz valley construction work Final progress payment works and
-Ureğil Urban Forest Project in Mamak, construction work site chief
-Stone wall manufacturing, lock parquet manufacturing Infrastructure works
- Measurement group work distribution
-Site business planning, concrete, fine fabrications, field meetings with mechanical and electrical
teams
-Concrete manufactures, infrastructure works, steel works, mechanical sheathing facade, key
parquet works facade, landscaping, isolation works, pool mechanical works, electrical works and
control of all fine fabrications
- Final account and progress payments - Occupational health and safety controls.

MARCH 2016-2018 ÖZDEN İNŞAAT
Construction chief
20.000 m2 factory construction rough works finishing works, infrastructure and Aluminum silicon facade
works Site chief palace
-Site business planning. Field meetings with concrete, fine fabrications, mechanical and electrical
Infrastructure, exterior pressed brick works and silicon facade subcontractors.
-Concrete fabrications, infrastructure works, exterior press brick works, aluminum facade, composite facade,
landscaping, isolation works, mechanical works, electrical works and control of all fine fabrications
- Final account and progress payment works Attachment drawing and control
-Material research and supply - measurement group work distribution
-Site business planning. Field meetings and work planning with control engineers, Reinforced concrete,
pressed brick facade, mechanical and electrical Aluminum facade subcontractors - Subcontractor proposal
collection and decision making
- weekly manufacturing reports
- Attachment drawings related to the changes, price differences studies
- Giving daily activity reports to the head office
Occupational health and safety controls

OCTOBER 2016 MY OWN JOB
Istanbul Beylerbeyi Pavilion Garden Renovations and General Renovations

JUNE 2009-2016 SUNGUR YAPI
Construction chief
TOBB Construction Site TOBB University Student Guest House finish works
Gölbaşı Lokman Hekim 13 villa construction, finish works
Ostim Eletrokent construction site, finish works
Yön plaza and Warehouse construction site, finish works
Kırıkale 300 bed State Hospital, finish works
Marriott Hotel, finish works
Hacettepe University Olympic Swimming Pool Construction finish works and steel
ONS Construction West Park Shopping Center finances, final account comparative exploration works
Presidency complex building Beştepe fine works Renaissance construction subcontractor. progress paymen
finish works Rönesans construction

Site control and job delivery with control engineers and architects
Field foremen and measurement group work distribution
-Site business planning. fine fabrications, field meetings with mechanical and electrical teams - Subcontractor
bidding and decision making
-Bims wall application, Drywall wall, ceiling application according to the coordinates given, control with
laser miter and scales, control of plaster works with a gauge square, control of screed works with laser level,
ceramic insulation works, black plaster and gypsum plaster painting works, marble sills, Sheathing works, key
parquet stone works, mechanical works, electrical works and control of all fine fabrications
- Final accounts and progress payments and preparation of attachments
- Weekly manufacturing reports to the main company
-Material supply and control
- Contract preparation with the head office
- Giving daily activity report to the head office and the main company
Occupational health and safety controls

NOVEMBER 2007-2009 AYKEL İNŞAAT
Construction chief
Yenimahalle toki Yenisarp inşaat construction site 960 residential rough building construction chief Ankara
Etimesgut Bağlıca vakıflar genel müdürlüğü 7 building formwork concrete rough construction site chief
ÇEVTAŞ TURYAP business partnership Ballıkuyumcu houses villa and apartment construction site

Work distribution with field engineers and measurement group

-Site meetings with construction site work planning subcontractor teams

- Subcontractor bidding and decision making

- Reinforced concrete manufactures, tunnel formwork and conventional formwork works, delivery
control and field engineer

- Final accounts and progress payments

-Weekly manufacturing reports for Hacettepe University construction works

- Attachment drawings related to changes, price differences study

-Sending daily activity reports to the head office

Occupational health and safety controls
SEPTEMBER 2005-2007 URANSAN A.Ş.
SİTE CHİEF
I am site chief in construction site
TOKİ project fine works and progress22 building uransan.AŞ ilksan site uransan.AŞ ilksan site.

DECEMBER 2004-2005 KARE YAPI
SİTE CHİEF

Ankamall subconstruction formwork concrete job

Military Service NOVEMBER 2011 ANKARA-TURKEY

Education
Mersin university construction department 2001-2003

Language • Turkish – Mother Tongue

• English – intermediate

Russian -- beginer

Date of Birth / Place 23.04.1980

Gender MALE

Marital Status MARRIED

Reference Alper akyuz somut inşaat construction chief 0535 483 56 90

B driving license, Autocad , Exel ,Word

More resumes of this candidate