- Файл
Hood
Welder
Контактная информация
Соискатель указал телефон и эл. почту.
Фамилия, контакты и фото доступны только для зарегистрированных работодателей. Чтобы получить доступ к личным данным кандидатов, войдите как работодатель или зарегистрируйтесь.
Получить контакты этого кандидата можно на странице https://www.work.ua/resumes/17216701/
Загруженный файл
Это резюме размещено в виде файла. Эта версия для быстрого просмотра может быть хуже, чем оригинал резюме.
Experienced Multi-skilled Associate
I consider myself to be an honest individual, an excellent
timekeeper, and always eager to pick up new skills. I am
friendly, mostly quiet, and reserved but always polite. I
am able to work independently and also within a team
. Hood setting.
in J
Calv WORK EXPERIENCE
PRODUCTION MIG WELDING
Digital Building Components - Phoenix AZ ( 7/2019 - 10/2019)
CONTACT MIG Welding - Performed 1F/2F positioned fillet welds on
medium to thick gauge sheet metal for use in wall framing.
All walls were prefabricated in the shop and then delivered to
the job site.
Blueprint Reading - Transferred dimensions from blueprints
[
measurements for accuracy before welding.
(928) 728-3424
Fast-paced Work Environment - Production of building
components was closely video-monitored and all work was
QC checked for accuracy and weld quality
IRONWORKING & FABRICATION
Klinger construction - Santa Fe, NM (7/2018 - 10/2018)
EXPERTISE SMAW Welding - Performed 2F/3F positioned 7018 fillet
welds. Also performed 2F/3F 6010 fillet welds
Oxy-Acetylene Torch - Used torch to cut 5" angle iron to
length for structural support between roof trusses. Fabricated
Steel Fabrication a man hole opening to access the roof-top
Commercial Electric Rigging - Secured and moved large I-Beams and Steel trusses
to various locations around job site
Q.C Lab Technician
Solar Installation SOLAR PANEL INSTALLION
(Meta Data Center) Aerotek - Albuquerque, NM (1/2018 - 4/2018)
Automotive Mechanics
Large Scale Project - Installed large polycrystalline
Electrical Circuits photovoltaic panels on a 20 Megawatt solar farm
Fast-paced Work Environment - Panels were placed on
solar arrays and torqued to spec. All work was QC checked
and production was closely monitored to ensure daily quota
was being met
COMMERCIAL ELECTRICAL
ADDITIONAL SKILLS DKD Electric LLC - Santa Fe, NM (10/2017 - 11/2017)
1st Year Apprentice - Installed "J-Boxes" and Cable trays with
uni-strut supports for Cat. 5 data cables. Also bent and
installed 3/4" EMT conduit for electrical wiring. After week 2
Strong MATH skills
was quickly assigned more advanced tasks.
Electrical circuitry knowledge
Previous OSHA 10 training Large Scale Project - Project was a large full-scale hospital
that required industrial grade switch gear, cable trays for
Previous MSHA 8 training
data, and conduit installation. I was assigned to work closely
Microsoft Excel experience with a licensed journeyman on each of these tasks.
Microsoft Office experience
Chemistry Lab. experience High Voltage Work - Installed 600 mcm insulated copper
wiring for 1600 amp switch gear in the main distribution
Cutting Shears experience room of the facility. Also used large hydraulic pipe bender to
Iron Worker experience contort 4" diameter EMT conduit
Band Saw experience
Drill Press experience
Mag Drill experience QUALITY CONTROL LAB TECH
G.C.C Rio Grande - Tijeras, NM (4/2017 - 10/2017)
4" Conduit bender experience
Fork Lift experience Laboratory Technician - Performed a multitude of chemical
analyses of cement samples. Routine tests included Acid
Scissor Lift experience
titrations, Blaine tests, weighing samples, X-Ray
Overhead crane lift experience spectrophotometry, Microscopy, etc. The results of these
Oxy-fuel Torch experience examinations were used to make real-time adjustments to
Track Torch experience the product during various stages of production.
Research and Development - Working closely with the Plant
chemist our team created a new specialized product for
Haliburton, TX-DOT, and NM-DOT. We also packaged and
sent out 5-gallon sealed bucket samples to several large-scale
EDUCATIONAL
corporations.
Production Worker - Also received cross-training in all areas
COURSES TAKEN of the plant. Most the of equipment, aside from the blast
furnace and conveyor system, around the plant had to be
manually operated.
MATH 170 (Pre-Calculus)
English - 118 (Technical Comp.)
Communications - 111
EDUCATION
Psychology - 120
Weld - 128 (Blueprint)
Weld - 129/130 (Basic welding) San Juan College - Farmington, NM
Associates of Applied Science (Welding Technology) (2014 - 2015)
Weld - 131 (MIG welding)
Weld - 132 (TIG welding)
Weld - 133/134 (Plate welding) Albuquerque Job Corps - Albuquerque, NM
New Mexico High School Diploma / Certified Nursing Program (2005 - 2006)
Weld - 135/136 (Metal Fab.)
Weld - 206/207 (Advanced Fab)
Weld - 211 (Metallurgy)
Похожие кандидаты
-
Зварник (газокеросинорез, ММА, MIG, MAG)
35000 грн, Запорожье -
Електрозварник, газорізальник
40000 грн, Запорожье -
Сварщик
Запорожье -
Зварювальник
45000 грн, Запорожье, Днепр , еще 6 городов -
Електрозварник
Запорожье -
Газоэлектросварщик
Запорожье