Resume from May 11, 2023 PRO

Антон

Country Manager, Project Director, главный энергетик, Chief Engineer, 100 000 UAH

Employment:
Full-time, part-time.
Age:
39 years
City of residence:
Kyiv
Ready to work:
Kyiv, Other countries, Remote

Contact information

The job seeker has entered a phone number, email and LinkedIn.

Name, contacts and photo are only available to registered employers. To access the candidates' personal information, log in as an employer or sign up.

Work experience

Construction Expert

from 12.2019 to now (4 years 5 months)
GOPA Infra GmbH, Київ (Project Preparation and Implementation)

Ukraine Municipal Infrastructure Programme, Preparation and Implementation (European Investment Bank (EIB):
•Review and update of Technical Solutions in line with the UMIP eligibility criteria, Beneficiary’s expectations and international best practices;
•Preparation the project technical specification and other necessary documentation in a manner compliant with international practices and the requirements of the Ukrainian regulations, and suitable for inclusion in the tender documentation;
•Carrying out the procurement in line with the EIB Guide to Procurement in a timely, transparent and efficient manner;
•Support to the project implementation, including construction monitoring and supervision until the supervision contractor has been contracted;
•Operational procedures at each PIU are defined and established. PIUs become fully operational and capable to manage their individual projects under the overall guidance from MRD/PMSU.

Country Representative

from 03.2019 to now (5 years 2 months)
United Green, Київ (Project Development)

•Identify potential investment opportunities.
•Identify, screen and present solar power generation projects and sites with a capacity of 20MW and more in Ukraine
•Assessment of “ready-to-build” projects which have secured a right to utilize land, whose technical specifications for grid connection have been approved, and which has received the regulatory approvals necessary for construction.
•Assessment of feasibility studies has been conducted, which has secured a right to utilize land, but lacks a full package of permissions and licenses necessary and required under Ukrainian law for construction and grid connection.
•“Greenfield” project analysis for which a local developer has not completed the above.
•Review the information and documents proposed by a local developer including but not limited to:
•Review all technical project documents such as project CAPEX, technical conditions for interconnection, project design documents, any concerns over the conditions imposed on a local developer for grid connection.
•Technical and grid connection aspects of the project.
Environmental issues

Director

from 03.2019 to now (5 years 2 months)
Solaris Energy, Київ (Solar Energy)

Development 40MW solar plant in Zakarpatia region from scratch
•Preparation of project documentation
•Obtaining the necessary permits and approvals for construction
•Paperwork and obtaining permissions for commissioning
•Commissioning of the generating facility

Technical expert / Project Coach

from 02.2019 to now (5 years 3 months)
PFAN, Київ (Project support)

Technical analysis of renewable energy and energy efficiency projects
•Advice to project owners
•Project support at the stage of obtaining financing
•Project support at the implementation and commissioning stage

Country Representative

from 03.2018 to 03.2019 (1 year)
Scatec Solar, Київ (Solar energy)

Solar projects in Ukraine – list of Donors (FMO, EBRD, IFC, PCG, …)
•Identify, screen and present solar power generation projects and sites with capacity of 20MW and more in Ukraine
•Assessment of “ready-to-build” projects which has secured a right to utilise land, whose technical specifications for grid connection have been approved, and which has received the regulatory approvals necessary for construction.
•Assessment of feasibility studies has been conducted, which has secured a right to utilise land, but lacks a full package of permissions and licenses necessary and required under Ukrainian law for construction and grid connection.
•“Greenfield” project analysis for which a local developer has not completed the above.
•Review the information and documents proposed by a local developer including but not limited to:
•Review all technical project documents such as project capex, technical conditions for interconnection, project design documents, any concerns over the conditions imposed on a local developer for grid connection.
•Technical and grid connection aspects of the project.
•Environmental issues

Director

from 03.2018 to 03.2019 (1 year)
Chista Energia – 2011, Київ (Solar Energy)

Solar plant in Cherkassy region – FMO
•Management of EBRD loan project;
•Management of projects;
•Development of technical specifications, basic data for Terms of reference for electric grid connection, wind measurements performance, planning of land use, cooperation with engineering companies, government institutions, subcontractors, developers;
•Review and approval of final designs before the start of the tender;
•Review of tender documents, analysis of the tender evaluation reports as well as review the respective contracts;
•Substation upgrade, security clearance, commissioning;
•Registration of rights in land for construction;
•Supervision and coordination of power output project;
•Supervision and coordination of substations reconstruction project;

Intern, Specialist EE & alternative energy

from 04.2017 to 06.2017 (2 months)
Energy Policy and Programs Mayor’s Office of Environment, Energy and Open Space, Boston, MA (Energy Efficiency)

Smart grid – Boston city council
•Participation in the development of the Smart Grid project
•Participation in energy efficiency projects in the municipal sector
•Participation in energy-saving projects in private households
•Participation in public consultations

Senior Sustainable Energy Expert

from 04.2017 to 06.2018 (1 year 2 months)
USAID, Київ (Municipal Energy Reform Project in Ukraine)

Municipal Energy Reform Project in Ukraine - USAID
•Support Sustainable Energy Plans (or similar documents) preparation and adoption in MERP partner localities and regions;
•Support to energy audits of municipal energy systems and buildings;
•Upon request, review and contribute to preparation of investment proposals (developing energy audits, prefeasibility studies, business plans) on Energy efficiency and CE projects for partner cities (district heating, water and waste water, public and residential buildings sectors);
•Provide support in identification, coordinate and support implementation of Energy Efficiency (EE) and Clean Energy (CE) demonstration projects;
•Coordinate and contribute to training of partner cities and municipal utilities on energy management cycle;
•Support introduction of energy management function with description of roles and responsibilities of energy managers in partner cities and utility companies;
•Coordinate preparation of assessments (energy audits etc.) related to identification of Energy Efficiency (EE) and RE projects;
•Participate in informational activities of the Project, such as trainings for journalists or field days;
•Contribute to other Project activities related to energy management and energy efficiency;
•Provide inputs to regular weekly, monthly and quarterly MERP project progress reports;
•Participate in monitoring of MERP project results;
•Liaise and collaborate with relevant local authorities and other key stakeholders;
•Perform other Project tasks on request of MERP Project management.

Deputy assistant

from 02.2016 to 09.2019 (3 years 7 months)
Verkhovna Rada of Ukraine, Київ (Legislation)

Legislation adoption – n/a
•Participation in working groups and discussion new legislation for Alternative energy projects (Auction model);
•Participation in energy efficiency strategies development;
•Participation in working interbranch groups on energy efficiency;
•Networking with Energy Efficiency working group at the Verkhovna Rada of Ukraine;
•Collaboration with Investors and donors in projects on infrastructure and energy efficiency;
•Analysis of the legal framework in energy efficiency;
•Drafting of proposals on improvement of legislation of Ukraine in order to increase investment attractiveness of projects and improve energy efficiency, including reducing their risk for private investors.

Technical Director

from 03.2015 to 07.2015 (4 months)
Energy Efficiency of Ukraine, Kiev (ESCO)

Gaz replacement projects – private investment
•Management of projects;
•Management of energy-saving projects in street lighting;
•Management of energy-saving projects of municipal objects;
•Management of gas substitution projects (converting of gas boiler on solid fuel, including wood chips and pellets);
•Designing of ESCO projects.

Adviser

from 03.2015 to 08.2019 (4 years 5 months)
State Agency on Energy Efficiency and Energy Saving of Ukraine, Kiev (Energy Efficiency and Energy Saving)

The introduction of European norms and standards in the Ukrainian legislation. Attracting investment. Maintenance of projects.

Adviser

from 08.2013 to now (10 years 9 months)
ESCO, Kiev (Energy Efficiency)

List of projects – list f Donors
•Management of UNDP, international donors and private investors loan project;
•Management of projects;
•Participation in energy efficiency strategies development;
•Analysis of projects on reconstruction and modernization of heat supply enterprises;
•Analysis of projects on reconstruction and modernization of water supply enterprises;
•Collaboration with Investors in projects on infrastructure and energy efficiency;
•Collaboration with line Ministries (Ministry of Regional Development, Construction, Housing and Communal Services, Ministry of Energy and Coal);
•Collaboration with the State Agency on Energy Efficiency and Energy Saving of Ukraine;
•Drafting of proposals on improvement of legislation of Ukraine in order to increase investment attractiveness of projects and improve energy efficiency, including reducing their risk for private investors;
•Development of energy efficiency projects;
•Elaboration of municipal energy efficiency program for Dubno city;
•Energy audit for Corum Group;
•Express energy audit of OJSC ‘Druzhkovsky engineering factory’;
•Express energy audit of Private Joint Stock Company ‘KZGO’;
•Energy audit of Bogolyubov Institute for Theoretical Physics of the National Academy of Science of Ukraine;
•Gas boiler converting on solid fuel in primary school in Chervonograd city, Sokal rayon;
•Heat meters installation support in Kramatorsk city (3 projects);
•Test operation support of LED lightning on Private Joint Stock Company ‘KZGO’;
•Technical audit support to the Ministry of Infrastructure of Ukraine;
•Audit
•Delivery of seminars and workshops for condominium’s members in Donetsk oblast;
•Facilitation of public access to ESCO;
•Participation in working group on ESCO in Naftogaz of Ukraine.

Chief Engineer/Chief Power Engineer

from 07.2012 to 01.2014 (1 year 6 months)
Wind Park Krasnodonskiy, Wind Park Lutuginskiy, Wind Park Antratsit (Lugansk) (clean energy)

- construction of the wind farm from scratch;
- projects management ;
- development of technical specifications, basic data for Terms of reference for electric grid connection, wind measurements performance, planning of land use, cooperation with engineering companies and goverment institutions;
- clearance of land for construction.

Chief Engineer

from 03.2012 to 06.2012 (3 months)
Wind Park Kerchenskiy, LLC Wind Park Prisivashskiy, LLC (Energy)

- construction of the wind farm from scratch
- negotiation with partners, subcontructors and local authorities
- adaptation and translation of professional technical literature, i.e. Service and Maintenance, Dispatching (list of wind turbine status codes), Manuals.
- clearance of land for construction.

Chief Power Engineer

from 12.2011 to now (12 years 5 months)
Wind Park Krasnodonskiy (Power industry)

- construction of the wind farm from scratch;
- projects management ;
- development of technical specifications, basic data for Terms of reference for electric grid connection, wind measurements performance, planning of land use, cooperation with engineering companies and goverment institutions.
- clearance of land for construction.

Senior Development Engineer

from 12.2011 to 03.2012 (3 months)
Wind Park Novoazovskiy, LLC (Energy)

* projects management ;
* development of technical specifications, basic data for Terms of reference for electric grid connection, wind measurements performance, planning of land use, cooperation with engineering companies and goverment institutions ;
* building of new wind parks

Head of Maintenance/Service Department and dispatching

from 09.2011 to 12.2011 (3 months)
Fuhrlaender Windtechnology, LLC (Manufactury of wind turbines)

Alternative energy, Production of WTGs in Ukraine.
* electrical and mechanical operations;
* commissioning, maintaining and upgrading installation activities;
* repairs and replacement activities of turbine components;
* greenfield establishment of Maintenance/Service Department and dispatching ;
* equipment and tools selection ;
* contracts execution on component parts supply ;
* contracts execution with subcontractors ;
* staff recruitment ;
* finding of training centres and contracts execution on training programmes ;
* works and supply performance control

Business Development Manager

from 08.2010 to 05.2011 (9 months)
S-engineering, LLC (Construction, architecture, interior design)

* marketing research of Ukrainian and Asian markets ;
* negotiation and contracts execution, including foreign partners ;
* participation in tenders and tender offers making ;
* technical consulting, equipment selection and finding of technical solutions ;
* territorial extension ;
* participation in exhibitions, trade fairs and conferences ;
* contractual duties performance control ;
* equipment and supply control ;
* cooperation and communication with business partners and subsidiaries ;
* project and plans review, required technical writing ;
* reports compiling.

Electronics-engineer/IT

from 07.2010 to 07.2011 (1 year)
Legality Assistance Department, LLC (Legal)

* equipment repair, including geodesic equipment ;
* components purchase ;
* setting and maintenance of network and network equipment ;
* Surveying engineer ;
* documentation on land and state acts of property right to land execution.

Head of sales Department

from 08.2007 to 07.2009 (1 year 11 months)
Micronlogistic, LLC (Balluff GmbH) (Destribution)

* marketing research;
* negotiation;
* participation in tenders;
* engineering and upgrade of equipment as technical consultant;
* closing of deals and supply performance;
* analysis of equipment breakage, repair methods proposal.

Assistant

from 09.2003 to 06.2007 (3 years 9 months)
Donbass State Engineering Academy (Education and science)

* repair and reconstruction of equipment ;
* methodological recommendations writing.

Education

MIM Kiev

MBA in Public Administration, Kiev
Higher, from 2015 to 2017 (2 years 8 months)

It's core curriculum meets the standards of MBA program, has concentration courses in public administration and public policy and leadership block. Although the program is developed in accordance with the international standards it is adapted to the Ukrainian conditions.

Donbass State Engineering Academy

Engineer electrician, Kramatorsk
Higher, from 2000 to 2007 (7 years 4 months)

Additional education and certificates

Fuhrlaender Academie, Testing of equipment and acceptance of WTGs in a shop environment

2011, 1 mouns

Fuhrlaender Academie, Control and Reporting, dispatching, SCADA system, Mita Technik, Service/Maintenance

2011, 1 week

DEWI

2013, Development of Wind Farms

RENAC

2013, Efficient Energy Supply: Generation and Transmission

RENAC

2013, Energy Efficiency for Commercial Enterprises

Knowledge and skills

MS Excel MS Word MATLAB

Language proficiencies

  • English — average
  • Ukrainian — fluent

References

  • Nadeshda Hilgenfeldt

    Nadeshda Hilgenfeldt

    Business Development Manager Russia and Eastern Europe, Baldor GmbH

    Contact details are hidden
  • Nazir Ramazanov

    Nazir Ramazanov

    Adviser, Ministry of Energy of Azerbaijan

    Contact details are hidden
  • Andrey Pivovarskiy

    Andrey Pivovarskiy

    Minister, Ministry of Infrastructure of Ukraine

    Contact details are hidden

Additional information

Drive license, category "B", one-year EU visa

More resumes of this candidate

Similar candidates

All similar candidates


Compare your requirements and salary with other companies' jobs: