Денис 

Chief project engineer (MEP, HVAC, Clean room renewables)

Considering positions:
Chief project engineer (MEP, HVAC, Clean room renewables), Операційний менеджер, Mechanical engineer, HVAC engineer, MEP, Clean room, Менеджер проєктів
Employment type:
full-time, part-time
Age:
37 years
City:
Kyiv

Contact information

The job seeker has entered a phone number , email and LinkedIn.

Name, contacts and photo are only available to registered employers. To access the candidates' personal information, log in as an employer or sign up.

Work experience

Auditor

from 03.2026 to now (2 months)
eurovent-certification.com, Київ (Консалтинг, бухгалтерія, аудит)

AHU manufacturer Audit processing
AHU manufacturer EU compliance check

PV and BESS engineer

from 10.2025 to now (7 months)
Self employed, Київ (Енергетика)

I am engaged in the design/selection of inverters and energy storage systems. Calculation solar panels fields, technical and economic justifications, generation modeling in PVSyst software. Supply, delivery, installation, and commissioning of inverters and battery storage systems. Compilation, assembly of automation panels, their installation as a component of automatic start-up systems for household generators for charging BESS battery storage systems. Search for optimal solutions both “here and now” and in terms of price/performance ratio

MEP engineer

from 07.2024 to 10.2025 (1 year 4 months)
Ateliers de France, Київ (Будівництво, архітектура, дизайн інтер'єру)

Responsible for all engineering issues in luxury construction.

Coordination between MEP and interior design. Fit out in MEP.

Planning of work, coordination between subcontractors.

Transfer of engineering systems from general contractor, to customer service representatives.

Coordination of works between subcontractors.

Water sanitation WASH manager

from 08.2023 to 06.2024 (11 months)
MSF - Doctors Without Borders, Київ (Неприбуткові, благодійні та громадські організації)

WASH activity of MSF, was related to Kahovska dam consequences

I performed Technical support/advising of MSF’s field teams who were doing wells cleaning procedures. (as a part of stomack disease prevention)

I updated technical side of wells cleaning & disinfection procedure. (procedure and equipment)

I managed field work and relations between WASH cluster participants, (assessment, due diligence, contractor selection, relations management, bore halls drilling supervision, complete works acseptance)

Also, I developed water and energy backups in MSF locations (UPS, generators, water tanks, treatment, storage, distribution) also as a part of winter preparation plan.

As an personal achievement, I’ve made it working in automatic mode, without any technical supervision in place, only periodic routine maintenance.

Interpriteur (Translator)

from 03.2023 to 06.2023 (4 months)
MSF (Medecins Sans Frontieres), Львів (Неприбуткові, благодійні та громадські організації)

I was a mental and language bridge between Ukrainians in (Ukrainian railways) and Belgium specialists from MSF, all together we made a "medical train project".

I assisted MSF engineers with local tips and tricks to complete the project.

Also, I did an "emergency medical aid, pharmacy stock", and assisted to maintain it.

I've taken a part in the implementation of the "medical train project", and now it runs and works. I made pharmaceutical stock from a "Giant mountain of boxes" in the warehouse, in an emergency context, Including cold chain storage, and cold chain preparation procedure updates.

Head of Operations

from 05.2018 to 09.2020 (2 years 5 months)
JSC "Miras solutions", Kiev (Construction, process engineering,)

Key responsibilities:
Project development, management of installation and commissioning works
- Exploration for optimized solutions, between price-functionality-regulatory requirements, in new and existing manufacturing sites of customers.
- Development of User Requirement Specifications "URS"
- Development of basic layouts and PID (plans, flowcharts, principal schemes)
- Design: Conceptual design, basic design, construction design
- Development of "as build" and "first run" documentation
- Contracting (cost calculations, customer contracts, subcontracts, supply contracts)
- Management of operations

Сommissioning, startup, validation, engineer.

from 03.2018 to 03.2021 (3 years)
self employed, Київ (Консалтинг, бухгалтерія, аудит)

"Man in the middle" in contractor-customers. relations.

Providing a full scope of works, between systems and equipment installation, and startup, as following:

"As build" inspection, changes review, changes legalization.
Systems and equipment startup, commissioning.
- smooth transfer of equipment from installation to the final user, and routine exploitation

Preparation and development of full package of validation documents.
Development of validation masterplan
Development of Validation methods, and protocols DQ IQ OQ PQ
Development of routine operation maitenance SOP's.

Ventilation Engineer

from 09.2017 to 04.2018 (8 months)
Ventilation Engineer, Slavutych (Nuclear decommissioning, Project in Ukraine ‘The Chernobyl New Safe Confinement’)

- Implementation of the appropriative Working Documentation (detailed design).
- Development of design of untypical components, interface connections.
- Managing staff/subcontractors coordination with construction (installation) team.
- Monitoring and maintaining the Engineering Department schedules to ensure the overall Project schedule is maintained
- Ensuring the HVAC requirements

Ventilation, Air Conditioning and Cleanroom Expert

from 11.2013 to 09.2017 (3 years 11 months)
Farmak PJSC, Kyiv (Chemical industry, pharmaceuticals)

- Design of ventilation systems in the premises of the pharmaceutical industry (laboratories, industrial clean rooms, explosive area, warehouse).
- Analysis of industry legislation and implementation of technical solutions in accordance with the requirements of GMP, ISPE and GOST, building standards.

HVAC Engineer

from 07.2012 to 11.2014 (2 years 5 months)
Arterium PJSC, Kiev (Chemical industry, pharmaceuticals)

- Ensuring continuous and proper operation of HVAC systems
- Control of performance of works by the contracting organizations on service of HVAC systems
- Development of instructions for maintenance of ventilation equipment, indicating the rules, regulations and frequency of its maintenance
- Ensuring compliance with the requirements, standards and frequency of maintenance of ventilation equipment
- Setup of airflow rates, air differential pressure in cleanroom systems (grades D-A according to the GMP classification)

Engineer of Process Automation Department

from 06.2010 to 07.2012 (2 years 2 months)
State Enterprise Regional Electric Grids, Kiev (wholesale of electricity)

Organization of activities for implementation of automated energy control and metering systems, process automation systems in electric grids of the company.

Ventilation and Air Conditioning Installation Engineer

from 04.2006 to 08.2008 (2 years 5 months)
Arktika LLC (Sale, installation, maintenance of HVAC systems), Simferopol (Construction, architecture, interior design)

Installation of split systems, ducted air conditioning systems, air handling units, soldering of freon pipelines, installation of air compressor and condensing units (chillers).

Motor Mechanic

from 06.2004 to 04.2006 (1 year 11 months)
Aves, Simferopol (car service)

Repair of Japanese and Korean cars, overhaul of petrol / diesel engines, transmission, break and hydraulic systems, chassis, repair of moving parts, valve train, manual transmission.
Preparation of cars for Yalta RALLY, maintenance of race cars in a rally environment.

Education

National University of Food Technologies Bachelor - Energy machine building/ Specialist- cooling machines

Bachelor - Energy machine building/ Specialist- cooling machines, Київ
Higher, from 2008 to 2012 (4 years)

College of National University of Food Technologies

Simferopol
Specialized secondary, from 2004 to 2008 (4 years)

Machines and Equipment, Installation and Maintenance of Refrigerating Compressor Machines and Equipment

Knowledge and skills

  • Уміння аналізувати
  • Управлінські навички
  • Управляння проектами
  • Управління командою
  • Управління будівельними проєктами
  • Знання нормативної документації
  • Ведення переговорів
  • Ведення ділових переговорів
  • Ділове листування
  • Уміння переконувати
  • Планування проєкту
  • Фінансове планування
  • Уміння планувати
  • Монтаж обладнання
  • Розробка креслень
  • Читання креслень
  • Управління проєктами
  • Читання проєктної документації
  • Проєктування
  • Ведення договірної роботи
  • Укладання договорів
  • Вичитка договорів
  • AutoCAD
  • MS Excel
  • Ініціативність

Language proficiencies

  • Ukrainian — fluent
  • English — fluent

Disability

3rd degree.
Диплопія, наслідки ЧМТ. Важко працювати прецензійною викруткою в темноті на драбині. Оновлені військово облікові документи, непридатний.

More resumes of this candidate

Similar candidates

All similar candidates


Compare your requirements and salary with other companies' jobs: