Mykola
Utilities Lead
Контактная информация
Соискатель указал телефон и эл. почту.
Фамилия, контакты и фото доступны только для зарегистрированных работодателей. Чтобы получить доступ к личным данным кандидатов, войдите как работодатель или зарегистрируйтесь.
Получить контакты этого кандидата можно на странице https://www.work.ua/resumes/15611485/
Опыт работы
Facilities Engineer
с 10.2023 по наст. время
(2 года 4 месяца)
United Nations World Food Programme (WFP), Київ (Неприбуткові, благодійні та громадські організації)
Key Achievements:
•Implementation of preventive maintenance for a 5-storey office building from the initial stage.
•Have successfully achieved 100% Level 1 Accessibility according to WFP Procedures and Standards for the Inclusive Accessibility of the Built Environment for all country and field offices (the first country in the world who has such achievement).
Responsibilities:
Responsible for managing, maintaining, and optimizing the physical infrastructure and engineering systems across 1 country office, 3 field offices, and 2 satellite offices, with a focus on ensuring that all workspaces are functional, safe, inclusive, and conducive to employee productivity.
•Office operations, maintenance, and repairs, including HVAC, electrical systems, plumbing, lighting, elevators, etc.
•Space management, including seating plan updates and premises renovations.
•Compliance: Ensure adherence to OSHA and other relevant workplace safety standards; conduct regular safety inspections and risk assessments.
•Staff support and coordination: Respond to employee requests regarding office-related issues (e.g., temperature control, furniture adjustments, equipment malfunctions).
Water & Habitat Engineer
с 02.2023 по 10.2023
(9 месяцев)
The International Committee of the Red Cross, Київ (Неприбуткові, благодійні та громадські організації)
Key Achievements:
•Signing of an MoU with the Ministry of Justice of Ukraine and its affiliated structures for premises renovation, window replacement, installation of a water purification system, etc.
Responsibilities:
•Assessment of facilities and engineering systems in places of detention.
•Implementation of projects aimed at increasing the resilience of facilities and engineering systems in places of detention, as well as improving living conditions for people deprived of their liberty.
Utilities Lead
с 12.2020 по 10.2021
(11 месяцев)
STADA, Біла Церква (Хімічна промисловість, фармацевтика)
Responsibilities:
•Manage the maintenance team (HVAC Engineer, Clean Utilities Engineer, Mechatronics Specialist) and outsourced companies for system operation, service, and maintenance.
•Implement capital investment projects for the systems under my responsibility.
Project Engineer
с 12.2019 по 03.2020
(4 месяца)
Beck & Pollitzer, Київ (Будівельна промисловість, деревообробка)
Responsibilities:
•Managed part of the project (glue kitchen, press commissioning, etc.) for production equipment installation during the OSB plant extension (Kronospan) in Novovolynsk.
Project Engineer
с 05.2019 по 10.2019
(6 месяцев)
Orion Group, Київ (Харчова промисловість)
Responsibilities:
•Managing the installation project of ammonia cooling equipment (8 MW refrigeration capacity) at a new poultry plant in Nikopol.
HVAC engineer
с 07.2013 по 11.2018
(5 лет 5 месяцев)
Novartis, Дистанційно (Хімічна промисловість, фармацевтика)
Key Achievements:
•Successfully implemented project, passing all qualification stages (DQ, IQ, OQ, PQ).
•Implemented preventive maintenance for HVAC&R equipment from the initial stage.
Responsibilities:
New pharmaceutical plant construction - HVAC and Refrigeration part of project implementation from Project to Routine Operational phase. System includes more than 100 AHUs for ventilation of clean rooms (approximately 7000 m2), laboratories and support buildings (more than 20000 m2).
Design stage:
•Preparation of User Requirement Specifications (URS).
•Design Qualification (DQ).
Construction / Installation stage:
•Work acceptance.
•Installation Qualification (IQ).
Start-Up:
•Implementation of HVAC system operation algorithms in the Building Management System (BMS) by subcontractor programmers.
•Commissioning.
•Operation Qualification (OQ).
Operation stage:
•Performance Qualification (PQ).
•Preparation of Standard Operating Procedures (SOPs).
•Coordination of equipment operation and maintenance.
•Training of maintenance personnel.
•Supervision of maintenance staff.
•Procurement of spares and external services.
Plant Facilities and Utilities Engineer
с 12.2008 по 06.2013
(4 года 7 месяцев)
Procter and Gamble, Бориспіль (Легка промисловість)
Key Achievements:
•Successfully passed authorities’ inspections.
•Implemented preventive maintenance planning and SAP PM in the Technical Support Department.
Systems Owner
•HVAC (chillers, AHUs, humidifiers, air conditioners, fan coils, thermal manifolds, thermal stations/equipment).
•Water Supply & Sewerage (water wells, water treatment systems).
•Compressed Air (compressors, dryers) and Pressure Vessels – safety system owner.
Responsibilities:
•Operation, maintenance, and upgrading of systems.
oSupervise maintenance staff
oAdjust and optimize equipment
oManage outsourcing companies
oSource and purchase equipment, spare parts, and services
•Collaboration with state organizations (heat/water supply companies, environmental authorities).
oPrepare reports (heat and water consumption, Form 2-TP)
oObtain permits (Form E-8, water limits)
•Train maintenance staff.
•Plan and implement system extensions and upgrades (capital projects).
•Budget planning and cost control.
Project Engineer
с 02.2006 по 02.2007
(1 год)
Coca-Cola Beverages Ukraine Limited, Велика Димерка (Харчова промисловість)
Responsibilities:
•User requirement specification preparation and bidding.
•Projects implementation.
•Schedule and quality control.
Projects:
Carried out projects during installation PET/Can line 44’000 bph, PET line 44’800 bph and juice lines. Such as utilities purchasing and installations (syrup room extension, transformer station extension, purchasing and installation high- and low-pressure compressors, chillers, construction works, utilities connection to the lines, electric connections, platform installation for line operating, filling rooms construction (“clean” room), equipment relocation, etc.).
Maintenance Planner
с 01.2006 по 02.2006
(2 месяца)
Coca-Cola Beverages Ukraine Limited, Велика Димерка (Харчова промисловість)
Responsibilities:
•Preparing work orders for technicians, work execution control.
Probationer
с 07.2005 по 01.2006
(7 месяцев)
Coca-Cola Beverages Ukraine Limited, Велика Димерка (Харчова промисловість)
Responsibilities:
•Update layouts of production equipment and utilities.
•Support for Project Manager activities (equipment’s capacity calculation and bidding for the equipment purchasing).
•Prepare and conduct contracts with foreign companies that provided services for production equipment.
Образование
National University of Food Technologies
Energetic, Київ
Высшее, с 2000 по 2005 (5 лет)
Specialty: Cooling machines and equipment
Знания и навыки
- MS Office
- AutoCAD
Знание языков
- Английский — выше среднего
- Украинский — свободно
Дополнительная информация
Qualified engineer with broad international experience in Ukraine and Russia, having worked with UN WFP, ICRC, Novartis, STADA, Procter & Gamble, and Coca-Cola. Expertise spans facilities operation and maintenance, clean and black utilities, and production equipment, including HVAC, pharmaceutical water systems, refrigeration, and industrial gases. Proven track record in major projects such as pharmaceutical plant construction, production line installations, and industrial cooling systems. Skilled in preventive maintenance, infrastructure optimization, team leadership, and compliance with safety and accessibility standards. Holds a Master’s degree in Cooling Machines and Equipment from the National University of Food Technologies, Kyiv.
20 years of experience in systems including:
Facilities Operation and Maintenance
Clean utilities
- HVAC for clean rooms and laminar flow systems
- Pharmaceutical water systems (Purified Water, Water for Injections, Clean Steam)
- Compressed air, nitrogen, and laboratory gases
Black utilities
- HVAC
- Refrigeration
- Water supply and sewerage
- Compressed air
Production equipment
Main Projects:
Novartis pharmaceutical plant construction – HVAC systems
Procter & Gamble plant extension – utilities installation
Coca-Cola production plant extension – production lines (PET/Can line 44’000 bph, PET line 44’800 bph and juice lines) and supporting utilities installation
Nikopol poultry plant – ammonia cooling plant installation (8 MW cooling capacity)
Kronospan wood-based panels plant extension – glue kitchen, press, and conveyors installation
Другие резюме этого кандидата
Рассматривает должности: Керівник відділу експлуатації, Головний інженер, Начальник дільниці, еще 7 должностей
Борисполь, Бровары, Киев
Высшее образование · Полная занятость, неполная занятость
- Інженер з експлуатації будівель та споруд, Всесвітня продовольча програма ООН (WFP), 2 года 4 месяца
Рассматривает должности: Facility manager, Utilities Engineer
Борисполь, Бровары, Киев
Usenko Mykola Kyiv, Ukraine Qualified engineer with broad international experience, having worked with UN WFP, ICRC, Novartis, STADA, Procter & Gamble, and Coca-Cola. Expertise spans facilities...